Bathroom Remodeling In Voorhees, NJ

Most bathroom remodels in Voorhees take two to six weeks. Ours often take one day.

That works when the layout stays where it is. Replacing a tub with a walk-in shower, swapping a worn shower unit, new wall surrounds, or accessibility work like grab bars and low-threshold showers. The drain and supply lines are already in place, everything is measured before the crew arrives, and the job is staffed to finish in a single visit. Nobody is rushing. The scheduling is just done differently.

If your bathroom needs the plumbing moved or a wall taken out, we’ll tell you it’s a multi-week job, because it is. That’s worth knowing before you book anyone.

One Day Bathrooms is the bathroom division of Showcase Remodels, a licensed New Jersey home improvement contractor based in Turnersville. Registration 13VH04055000, accredited with the Better Business Bureau at an A+ rating. Our customers leave their reviews on Google, the BBB and Facebook, on accounts we do not control. Free estimates, and we’ll tell you straight whether yours is a one-day job.

Local detail. Voorhees sits in Camden County. A bathroom permit here is issued by the local construction office rather than by the county, and pulling it is part of the job on our side, not yours. Our showroom is at 505 NJ-168 in Turnersville, and we work Cherry Hill, Haddonfield, Haddon Heights and Sicklerville as well.

Services We Offer In Voorhees:

01.

Conversions

Tub-to-shower conversions are the most common single-day job we do. The old tub comes out and goes with us, a walk-in shower goes into the same footprint, and the drain and supply lines stay exactly where they are. We do the reverse too, replacing a dated shower with a soaker or walk-in tub, when that suits the room better.

02.

Faucets

New taps, showerheads and hardware fitted to your existing connections, which is usually a same-day job. Single-lever and high-arc designs in finishes we can match to what is already in the room. If you are keeping the sink, send us a photo and we will tell you what fits the existing hole spacing before you buy anything.

03.

Showers

Frameless glass enclosures, rainfall and multi-jet showerheads, built-in benches and shelf niches. Worth deciding on the extras while we are measuring rather than afterwards, because they change how the surround panels are cut.

04.

Wall Surrounds

Solid surface or natural stone. Solid surface is seamless with no grout lines to scrub. Stone costs more and looks it. Both go in over a single day when they are replacing what is already there.

Our Work In Voorhees:

Existing corner jetted tub with a beige tile deck and oak cabinetry, before remodeling
Walk-in shower finished in white marble-look tile with a sliding glass enclosure, a built-in corner bench, a recessed niche and a mosaic tile floor
Full bathroom with a white tub and shower surround, a grab bar and corner shelves, a granite-topped vanity and grey wood-look plank flooring
Freestanding soaking tub with a chrome floor-mounted filler and handheld, marble-look tile flooring and a tall dark espresso linen cabinet

How Does Bathroom Remodeling Work?

1. We measure before we quote. Someone comes out, measures the room and looks at the existing plumbing. That visit is what tells us whether your bathroom is a one-day job or a multi-week one, and you get that answer before you commit to anything.

2. You choose the materials. Surround material, fixtures, finishes. We will show you what fits the space and tell you when the cheaper option is the better one for your room.

3. Everything is ordered and cut first. Materials are on the truck before the crew is scheduled. This is the actual reason a single-day install works. Nothing is being rushed on site.

4. Installation. If the layout is not changing, the crew is staffed to finish in one visit and you have the room back that evening. If the plumbing is moving, there is a permit and an inspection on the township timetable, and we will have told you that at step one.

5. We clean up and take the old fittings away. No tub on the driveway waiting for a skip.

Want a Free Quote? Call Us Now: (856) 783-8880

Showcase Remodels Van
[grw id=1021]

Frequently Asked Questions:

Yes, but not every bathroom. It works when the layout stays where it is. If the plumbing has to move or a wall comes down, it is a multi-week job and we will tell you that rather than let you find out on install day.

Tub-to-shower conversions, replacing a worn shower or tub in the same position, new wall surrounds, new taps and hardware on existing connections, and accessibility work like grab bars and low-threshold showers. The drain and supply lines are already where they need to be.

Moving the toilet, sink or shower. Removing a wall or changing the room shape. Full gut renovations with a new layout. Anything needing a permit inspection partway through, because that happens on the township timetable and not ours.

It finishes in a day because of preparation, not speed. The room is measured before anyone is scheduled, the materials are on the truck when the crew arrives, and the job is staffed to complete in one visit. Nobody is rushing to beat a clock.

Get a Free Estimate in Voorhees

Tell us about your bathroom and we’ll tell you what it needs, including whether it’s a one-day job. Prefer to talk? Call (856) 783-8880.


New Jersey Home Improvement Contractor Reg. #13VH04055000  ·  BBB Accredited with an A+ rating  ·  505 NJ-168 D, Turnersville, NJ 08012